Building Availability
These floor plans illustrate which areas of the building will be accessible during Stage A from March to mid-June 2023. This stage will focus on demolition of the core areas that will be renovated and include about three weeks of asbestos abatement that will affect practically every part of the main building.
To the right, you can see a slide show with all levels of the main building (main level, loft, and lower level). Below, you can scroll through each floor plan and read more about what is happening in each area.